Liquidity Services Brands

153,000bpd Crude Oil Terminal Stabilisation Plant

Sales/Lot Type:

Make Offer

Removal & Shipping:

Buyer Must Arrange. See details.

Cancel this Offer

Full payment details can be found in here

I have read and understand the Terms & Conditions, my bid amount is correct, and I can arrange shipping/handling.

Your account will be locked if you are the winning bidder and fail to pay for this asset. Additionally, you will be charged a service fee of 40% of your winning bid.

WATCHERS: 3 |VISITORS: 26

Taxes

To be added at payment

Buyer's Premium

18%

Seller's Terms & Conditions

View

Description

Lot#

27040-1

Condition

Used/See Description

153,000bpd Crude Oil Terminal Stabilisation Plant
comprising

Degasser Unit (Unit 9600) with Heat Transfer Unit,
Gas Plant (Unit 9400), and
Liquified Gas Treating Unit (Unit 9330)

Degasser Unit (Unit 9600) in two parallel trains

Request Process Flow Schemes 9600/09/010 to 9600/08/015

Degasser Trains A & B each with
4x live oil/stabilised oil heat exchangers
Live oil/heat transfer fluid heater
Flow control valve
Degasser Vessel (NOT INCLUDED for train A)
Stabilised crude pump
Degasser water pump
1st stage knock-out drum
Siemens fixed speed two stage centrifugal compressor
1st stage condenser
1st stage separator
1st stage HC pump
2nd stage knock-out drum
2nd stage condenser
2nd stage separator
Stabiliser feed pump
2nd stage condenser

Heat Transfer Fluid (HTF) System
Request to Process Flow Schemes 9600/08/016, /017 & /035

HTF Furnace
2x forced draught fans
Induced draught fan
Air preheater
Flue gas cooler
HTF storage tank
HTF make up pump
HTF expansion vessel
2x HTF HT circulation pumps
2x HTF LT circulation pumps
HTF drain collection vessel
HTF drain pump
Furnace LP fuel gas knock-out drum

Gas Plant Unit (Unit 9400)
Request Process Flow Scheme 9400/08/001 to /003

Stabiliser
Stabiliser feed shell & tube heat exchanger pre-heater
Stabiliser column
Stabiliser reboiler
Stabiliser OVHD condenser
Stabiliser OVHD accumulator
2x Stabiliser reflux pumps
Naptha rundown cooler

Deethaniser
2x Stabiliser LPG pumps
Deethaniser OVHD condenser
Deethaniser OVHD accumulator
2x deethaniser reflux pumps
Deethaniser column
Deethaniser reboiler

Depropaniser
Depropaniser column
Depropaniser reboiler
Depropaniser OVHD condenser
Depropaniser OVHD accumulator
2x propane product/reflux pumps
Butane rundown cooler


Liquified Gas Treating Unit (Unit 9300)
Request Process Flow Schemes 9300/08/001 to 9300/08/002

6x propane adsorbent beds
Shell & tube propane cooler
6x butane adsorbent beds
Shell & tube butand cooler
Scam TPE water treatment plant including softener, Biodispers tank & 2x dosing pumps, Performax tank & 2x dosing pumps, cooling water tower, 2x cooling water circulation pumps
8x 1,800m3 storage vessels
4x export pumps

Flare system
Flare stack with various knock-out vessels/drums and pumps
LPG drain vessel

A range of spare parts

Download the file "27040-1 DOP 153Kbpd crude stabilisation plant.pdf" below for more detailed information.


Contact LSI-EMEA@liquidityservices.com, +44 (0)20 7098 3792 to request
    Appointment to inspect
    Process Description
    Equipment and Spare Parts Lists
    P&IDs
   .nwd 3D Model
    Building Layouts

  

Inspection

Items offered for sale are sold “as is / where is” subject to sale terms and conditions. Most items are used and may contain defects. Bidders may inspect the property prior to bidding. Inspection is by appointment only. Please use the 'Ask your question' feature to schedule an appointment for Inspection.

Payment

Wire Transfer is the only payment option for this item. The Wire Transfer Transaction Summary page will provide payment and account information. The Wire Transfer must be completed within 5 days unless otherwise specified below.
Sales will be concluded by a contract direct with the seller, which will include payment instructions.

Removal

Sales will be concluded by a contract direct with the seller, which will include removal instructions. Items may be removed by appointment only. All items must be removed within the removal period stated in the sale contract. The Buyer is responsible for all arrangements and work related to the removal of the assets unless otherwise stated and must adhere to the site-specific health and safety requirements. LSI or any of its group of companies does not act as shipper or exporter of record without its express consent. For EU located assets, non-EU buyers need to engage a customs broker /freight forwarder if exporting assets outside of the EU.

Removal and Transportation Options

Discover unbeatable nationwide transporters from our preferred shippers. Explore our curated list of qualified third-party shipping vendors to revolutionize your shipping experience.

Learn More

Special Instructions

Sales will be concluded by a contract direct with the seller. Please note: If you are the winning bidder and default on your purchase in any way, your account may be locked, and you will be unable to bid on future sales. Please familiarise yourself with the event’s specific terms & conditions.

Additional Information

First time bidding? Please review our Terms and Conditions.

For further assistance please review our Frequently Asked Questions.

Turn Your Surplus Inventory Into Cash

Sell On AllSurplus !

Get Started Today