- Categories
Surplus BioPharma
- Find Auctions
- Locations
- Closing Today
- New Listings
Restriction: 25500 Please contact us for bidding rights 请联系我们申请出价权限 Email: Fiona.Xu@liquidityservices.com
Make Offer
Location:
Suzhou, Jiangsu, CHNRemoval & Shipping:
Buyer Must Arrange. See details.
WATCHERS: 1 |VISITORS: 17
Taxes
To be added at payment
Buyer's Premium
18%
Seller's Terms & Conditions
Event
Micro-Vu
M3211437
2006
6273
25500-48
Used/See Description
Video Measuring System, Maker Micro-Vu, Model M3211437, S/N 6273, YOM 2006;
* A refundable deposit CNY500,000 or USD70,000 is needed prior to bidding;
* All prices are net prices and subject to 18% buyer’s premium and applicable taxes (13% VAT on assets and 6% VAT on top of buyer’s premium); If buyer places RMB100 on line, buyer shall to pay 100×1.13+100×0.18×1.06=RMB132.08;
* Transaction currency: CNY;
* Payment type and due: Wire Transfer; GoIndustry DoveBid will raise proforma invoices first and all payments must be made to designated bank account prior to pick-up; payment due 3 days upon proforma invoice date;
* Please ensure beneficiary receives 100% of the invoice amount, all bank charges shall be borne by payer;
* Buyer must use the same entity name for deposit (if applicable), offering and payment;
* 买家在出价前需支付保证金人民币50万元(可退);
* 此次销售的出价为不含税不含佣金(设备税 率13%,买家佣金18%,佣金税率6%)金额; 比如网上出价人民币100 元,则买方总计需支付 100×1.13+100×0.18×1.06=132.08元
* 交易货币:人民币;
* 付款方式及期限:银行转账; 高富拍卖将会先开具形式发票, 请按照形式发票上的付款指示将货款支付到指定账户;付款期限为形式发票日期3天内;
* 请务必确保卖家收到100%货款,买家需承担所有银行转账费用;
* 竞买人必须使用同一家公司来支付保证金(如有)、参加在线出价以及支付货款;
* Buyer should strictly follow seller's schedule and site EHS requirement for removal and collection;
* Buyer should be responsible for all the export and import related issue and cost;
* Dismantling, packing, rigging, loading and shipping fee(Including any other related fee) are at buyer's sole expense, buyer should be responsible for all the export and import related matter and cost;
* The range of cable should be from control cabinet to main machine;
* Buyer should clean up the site if the buyer has the trash or waste liquid generated when the equipment is removed;
* Holes on roofs and walls need to be covered/reinstated according to seller requirement/specs at buyer's sole expense during asset dismantling;
* Site clearance date: no later than 2/28/2024;
* 买家提货需严格遵守卖家给出的时间表和现场施工作业安全要求;
* 所有进出口事宜均由买家自行负责;
* 拆卸、包 装、吊装、搬运及运输所产生的费用(包括任何由此产生的工程费用)由买家自理,所有进出口事宜均由买家自行负责;
* 所有设备电缆界定范围:从设备到该设备的控制柜;
* 买家在设备拆除时所产生的垃圾废液等,需买家自行清理;
* 如设备拆卸搬 运过程中涉及到修补屋面洞及墙洞,买家需负责按照卖家要求及标准修补并承担相应费用;
* 设备搬离时间:不晚于2/28/2024;
Discover unbeatable nationwide transporters from our preferred shippers. Explore our curated list of qualified third-party shipping vendors to revolutionize your shipping experience.
First time bidding? Please review our Terms and Conditions.
For further assistance please review our Frequently Asked Questions.